ITAC Assessment: UF0304
ITAC logo
ITAC Assessment: UF0304
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Non Woven Fabrics
NAICS
n/a
SIC 2297: Non-woven Fabrics
Sales Range n/a
# of Employees 105
Plant Area 25,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $611,554 26,846,040
kWh
Electricity Demand $430,794 47,422
kW-mo/yr
Other Energy $374,559 54,896
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $343,707 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,938

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,492 $10,725 $1,327
57,678
kWh
$1,165
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $23,630 - $20,215
518,343
kWh
- $419 $2,996
03 2.4133: Use most efficient type of electric motors $29,432 $110,539 $19,103
830,556
kWh
$10,329
-
kW-mo/yr
- -
04 2.4321: Upgrade obsolete equipment $265,075 $1,028,304 $265,075
6,796,798
kWh
- - -
05 2.4238: Do not use compressed air for personal cooling $7,014 - $7,014
179,839
kWh
- - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,158 $1,895 - - $3,158 -
07 4.632: Change operating conditions $6,000 $472 - - $6,000 -
08 4.513: Re-arrange equipment layout to reduce labor costs $6,906 $600 - - $6,906 -
TOTAL RECOMMENDED $343,707 $1,152,535 $312,734
8,383,214
kWh
$11,494
-
kW-mo/yr
$16,483 $2,996
TOTAL IMPLEMENTED $44,938 $121,736 $27,444
1,068,073
kWh
$11,494
-
kW-mo/yr
$6,000 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs