ITAC Assessment: MA0299
ITAC logo
ITAC Assessment: MA0299
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product coorrugated products
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 171,375
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $534,115 6,821,512
kWh
Natural Gas $108,939 33,456
MMBtu
Fuel Oil #4 $82,833 23,401
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $35,014 $102,795 $64,794
827,374
kWh
$(-29,780.0)
-
MMBtu
02 2.6231: Utilize controls to operate equipment only when needed $4,797 $4,000 $4,797
61,254
kWh
-
03 2.6218: Turn off equipment when not in use $9,593 $1,526 $9,593
122,509
kWh
-
04 2.7122: Disconnect ballasts $8,033 $411 $8,033
102,579
kWh
-
05 2.7124: Make a practice of turning off lights when not needed $1,707 - $1,707
21,688
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $597 $525 $597
7,620
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,724 - $6,724
85,580
kWh
-
08 2.2511: Insulate bare equipment $4,792 $1,267 - $4,792
-
MMBtu
09 2.2414: Use waste heat from hot flue gases to preheat $1,660 $5,030 - $1,660
-
MMBtu
10 2.2113: Repair or replace steam traps $470 $1,396 - $470
-
MMBtu
11 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $413 $1,650 $413
5,275
kWh
-
TOTAL RECOMMENDED $73,800 $118,600 $96,658
1,233,879
kWh
$(-22,858.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs