ITAC Assessment: MA0289
ITAC logo
ITAC Assessment: MA0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Indexable milling cutter
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $5
M
to 10
M
# of Employees 92
Plant Area 64,635
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,625 1,066,823
kWh
Fuel Oil #4 $14,973 3,917
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,391 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,716

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $8,282 $20,878 $8,282
-
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,675 $4,811 $6,675
67,409
kWh
03 2.4221: Install compressor air intakes in coolest locations $486 $67 $486
4,982
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,948 $180 $1,948
19,637
kWh
TOTAL RECOMMENDED $17,391 $25,936 $17,391
92,028
kWh
TOTAL IMPLEMENTED $10,716 $21,125 $10,716
24,619
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs