ITAC Assessment: MA0282
ITAC logo
ITAC Assessment: MA0282
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Flexible electric insula
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 56
Plant Area 50,000
ft2
Annual Production 1,166
thousand feet
Production Hrs. Annual 4,704
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,287 976,846
kWh
Natural Gas $190,851 57,650
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,512 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,399

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2211: Use optimum temperature $22,157 $11,271 - $22,157
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,828 $23,220 $9,828
87,046
kWh
-
03 2.2511: Insulate bare equipment $6,041 $1,622 - $6,041
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $1,625 $2,854 - $1,625
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,721 - $1,721
15,240
kWh
-
06 2.3132: Recharge batteries on during off-peak demand periods $475 - $475
-
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $430 $230 $430
3,810
kWh
-
08 2.2122: Install / repair insulation on condensate lines $235 $247 - $235
-
MMBtu
TOTAL RECOMMENDED $42,512 $39,444 $12,454
106,096
kWh
$30,058
-
MMBtu
TOTAL IMPLEMENTED $18,399 $27,926 $10,733
90,856
kWh
$7,666
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs