Assessment Year | 1993 |
---|---|
Principal Product | turbine blades and vanes |
NAICS |
n/a
|
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
85,526
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,713
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $405,125 | 4,846,718 |
kWh
|
$0.084 |
Natural Gas | $72,272 | 10,907 |
MMBtu
|
$6.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,595 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $51,045 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $39,298 | $39,650 |
$39,298
470,106
kWh
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,123 | $3,800 |
$7,742
92,614
kWh
|
$(-2,619.0)
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,443 | $5,557 |
$4,443
53,048
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,397 | $91 |
$1,397
16,706
kWh
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $784 | $180 |
$784
9,379
kWh
|
- | |
06 | 2.2122: Install / repair insulation on condensate lines | $550 | $126 | - |
$550
-
MMBtu
|
|
TOTAL RECOMMENDED | $51,595 | $49,404 |
$53,664
641,853
kWh
|
$(-2,069.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $51,045 | $49,278 |
$53,664
641,853
kWh
|
$(-2,619.0)
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs