ITAC Assessment: MA0277
ITAC logo
ITAC Assessment: MA0277
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product turbine blades and vanes
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 85,526
ft2
Annual Production 0
units
Production Hrs. Annual 6,713
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $405,125 4,846,718
kWh
Natural Gas $72,272 10,907
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,595 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,045

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $39,298 $39,650 $39,298
470,106
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,123 $3,800 $7,742
92,614
kWh
$(-2,619.0)
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,443 $5,557 $4,443
53,048
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,397 $91 $1,397
16,706
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $784 $180 $784
9,379
kWh
-
06 2.2122: Install / repair insulation on condensate lines $550 $126 - $550
-
MMBtu
TOTAL RECOMMENDED $51,595 $49,404 $53,664
641,853
kWh
$(-2,069.0)
-
MMBtu
TOTAL IMPLEMENTED $51,045 $49,278 $53,664
641,853
kWh
$(-2,619.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs