ITAC Assessment: MA0276
ITAC logo
ITAC Assessment: MA0276
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Potat Chips
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 38
Plant Area 57,000
ft2
Annual Production 7,200,000
lb
Production Hrs. Annual 3,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,577 599,941
kWh
Natural Gas $147,225 40,098
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,811 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,916 $734 $1,916
16,706
kWh
-
02 2.1213: Direct warmest air to combustion intake $1,710 $4,215 - $1,710
-
MMBtu
03 2.4133: Use most efficient type of electric motors $1,072 $3,787 $1,072
9,379
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $704 $88 $704
6,155
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $369 $689 $369
3,224
kWh
-
06 2.6214: Shut off pilots in standby equipment $40 - - $40
-
MMBtu
TOTAL RECOMMENDED $5,811 $9,513 $4,061
35,464
kWh
$1,750
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs