ITAC Assessment: MA0274
ITAC logo
ITAC Assessment: MA0274
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Printed Circuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 167
Plant Area 136,000
ft2
Annual Production 60
thousand feet
Production Hrs. Annual 4,250
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $636,484 7,658,851
kWh
Fuel Oil #4 $130,472 33,769
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,153 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.6121: Reduce hot water temperature to the minimum required $9,079 $2,733 - $9,079
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,949 $125 $1,949
23,447
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $853 - $853
10,258
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $585 $91 $585
7,034
kWh
-
05 2.2122: Install / repair insulation on condensate lines $687 $169 - $687
-
MMBtu
TOTAL RECOMMENDED $13,153 $3,118 $3,387
40,739
kWh
$9,766
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs