ITAC Assessment: AM0906
ITAC logo
ITAC Assessment: AM0906
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Elementary School Students
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 60,000
ft2
Annual Production 100
units
Production Hrs. Annual 3,377
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,119 495,744
kWh
Electricity Demand $44,770 3,336
kW-mo/yr
Natural Gas $7,434 669
MMBtu
TOTAL YEARLY COSTS $73,323
RECOMMENDED SAVINGS* $29,939 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $725 $23,638 $422
9,913
kWh
- $303
-
MMBtu
02 2.9114: Use solar heat to make electricty $27,883 $577,200 $22,932
538,308
kWh
$4,951
-
kW-mo/yr
-
03 2.5123: Reduce fluid flow rates $1,047 $3,000 $1,047
24,580
kWh
- -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $284 $2,655 $136
3,181
kWh
$148
-
kW-mo/yr
-
TOTAL RECOMMENDED $29,939 $606,493 $24,537
575,982
kWh
$5,099
-
kW-mo/yr
$303
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs