ITAC Assessment: MA0253
ITAC logo
ITAC Assessment: MA0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FASTENERS, TOOLS, ETC.
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 240,000,000
pieces
Production Hrs. Annual 6,058
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $856,076 11,389,215
kWh
Natural Gas $442,988 76,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,869 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,576

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $9,608 $15,134 - $9,608
-
MMBtu
02 2.7243: Improve air circulation with destratification fans / other methods $22,977 $5,000 $22,977
305,686
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $6,697 $2,524 $6,697
89,097
kWh
-
04 2.2511: Insulate bare equipment $8,302 $4,977 - $8,302
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $5,078 $2,000 - $5,078
-
MMBtu
06 2.6232: Install set-back timers $3,216 $2 $3,216
42,790
kWh
-
07 2.2511: Insulate bare equipment $1,785 $525 $1,785
23,740
kWh
-
08 2.4321: Upgrade obsolete equipment $903 $2,000 $903
12,016
kWh
-
09 2.2122: Install / repair insulation on condensate lines $303 $430 - $303
-
MMBtu
TOTAL RECOMMENDED $58,869 $32,592 $35,578
473,329
kWh
$23,291
-
MMBtu
TOTAL IMPLEMENTED $47,576 $24,660 $32,890
437,573
kWh
$14,686
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs