Assessment Year | 1992 |
---|---|
Principal Product | FASTENERS, TOOLS, ETC. |
NAICS |
n/a
|
SIC | 3423: Hand and Edge Tools, Except Machine Tools and Handsaws |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 240,000,000
pieces
|
Production Hrs. Annual | 6,058
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $856,076 | 11,389,215 |
kWh
|
$0.075 |
Natural Gas | $442,988 | 76,000 |
MMBtu
|
$5.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $58,869 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,576 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $9,608 | $15,134 | - |
$9,608
-
MMBtu
|
|
02 | 2.7243: Improve air circulation with destratification fans / other methods | $22,977 | $5,000 |
$22,977
305,686
kWh
|
- | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,697 | $2,524 |
$6,697
89,097
kWh
|
- | |
04 | 2.2511: Insulate bare equipment | $8,302 | $4,977 | - |
$8,302
-
MMBtu
|
|
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,078 | $2,000 | - |
$5,078
-
MMBtu
|
|
06 | 2.6232: Install set-back timers | $3,216 | $2 |
$3,216
42,790
kWh
|
- | |
07 | 2.2511: Insulate bare equipment | $1,785 | $525 |
$1,785
23,740
kWh
|
- | |
08 | 2.4321: Upgrade obsolete equipment | $903 | $2,000 |
$903
12,016
kWh
|
- | |
09 | 2.2122: Install / repair insulation on condensate lines | $303 | $430 | - |
$303
-
MMBtu
|
|
TOTAL RECOMMENDED | $58,869 | $32,592 |
$35,578
473,329
kWh
|
$23,291
-
MMBtu
|
||
TOTAL IMPLEMENTED | $47,576 | $24,660 |
$32,890
437,573
kWh
|
$14,686
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs