ITAC Assessment: MA0252
ITAC logo
ITAC Assessment: MA0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product STRIP ALUMINUM
NAICS
n/a
SIC 3353: Aluminum Sheet, Plate, and Foil
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area
n/a
Annual Production 29,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $526,050 5,408,851
kWh
Natural Gas $244,914 33,638
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $207,887 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $156,976

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1331: Burn a less expensive grade of fuel $152,380 $100,000 - $152,380
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,026 $33,800 $24,026
247,069
kWh
-
03 2.2444: Use hot process fluids to preheat incoming process fluids $17,456 $55,777 - $17,456
-
MMBtu
04 2.2437: Recover waste heat from equipment $8,460 $4,239 $(-713.0)
(-7,327)
kWh
$9,173
-
MMBtu
05 2.3132: Recharge batteries on during off-peak demand periods $3,342 - $3,342
-
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $1,254 $600 $1,254
12,896
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $969 $3,289 $969
9,965
kWh
-
TOTAL RECOMMENDED $207,887 $197,705 $28,878
262,603
kWh
$179,009
-
MMBtu
TOTAL IMPLEMENTED $156,976 $100,600 $4,596
12,896
kWh
$152,380
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs