Assessment Year | 1992 |
---|---|
Principal Product | STRIP ALUMINUM |
NAICS |
n/a
|
SIC | 3353: Aluminum Sheet, Plate, and Foil |
Sales Range | $50 M to 100M |
# of Employees | 160 |
Plant Area |
n/a
|
Annual Production | 29,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $526,050 | 5,408,851 |
kWh
|
$0.097 |
Natural Gas | $244,914 | 33,638 |
MMBtu
|
$7.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $207,887 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $156,976 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1331: Burn a less expensive grade of fuel | $152,380 | $100,000 | - |
$152,380
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $24,026 | $33,800 |
$24,026
247,069
kWh
|
- | |
03 | 2.2444: Use hot process fluids to preheat incoming process fluids | $17,456 | $55,777 | - |
$17,456
-
MMBtu
|
|
04 | 2.2437: Recover waste heat from equipment | $8,460 | $4,239 |
$(-713.0)
(-7,327)
kWh
|
$9,173
-
MMBtu
|
|
05 | 2.3132: Recharge batteries on during off-peak demand periods | $3,342 | - |
$3,342
-
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,254 | $600 |
$1,254
12,896
kWh
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $969 | $3,289 |
$969
9,965
kWh
|
- | |
TOTAL RECOMMENDED | $207,887 | $197,705 |
$28,878
262,603
kWh
|
$179,009
-
MMBtu
|
||
TOTAL IMPLEMENTED | $156,976 | $100,600 |
$4,596
12,896
kWh
|
$152,380
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs