ITAC Assessment: MA0244
ITAC logo
ITAC Assessment: MA0244
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product RADIATORS,AIR SYSTEMS
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 1,000,000
lb
Production Hrs. Annual 2,125
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,398 1,435,229
kWh
Natural Gas $69,965 11,211
MMBtu
Fuel Oil #2 $2,649 75,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,322 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,382

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6232: Install set-back timers $822 $528 $822
9,379
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $156 - $156
1,758
kWh
03 2.4221: Install compressor air intakes in coolest locations $494 $319 $494
5,569
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,327 $300 $1,327
14,947
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,405 $3,381 $1,405
15,826
kWh
06 2.6218: Turn off equipment when not in use $1,118 $246 $1,118
12,603
kWh
TOTAL RECOMMENDED $5,322 $4,774 $5,322
60,082
kWh
TOTAL IMPLEMENTED $3,382 $4,000 $3,382
38,100
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs