ITAC Assessment: MA0242
ITAC logo
ITAC Assessment: MA0242
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product DAIRY PRODUCTS, JUICES
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 57
Plant Area
n/a
Annual Production 14,400
Tgal
Production Hrs. Annual 4,992
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,933 3,653,283
kWh
Natural Gas $4,432 752
MMBtu
Fuel Oil #2 $51,603 10,361
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,833 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,574

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,258 $18,756 $14,258
188,746
kWh
- -
02 2.6232: Install set-back timers $1,047 $800 $1,047
13,775
kWh
- -
03 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $996 - $996
13,189
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $712 - $753
9,965
kWh
$(-41.0)
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $531 - $531
7,034
kWh
- -
06 2.2511: Insulate bare equipment $289 $864 - - $289
-
MMBtu
TOTAL RECOMMENDED $17,833 $20,420 $17,585
232,709
kWh
$(-41.0)
-
MMBtu
$289
-
MMBtu
TOTAL IMPLEMENTED $2,574 $800 $2,574
33,998
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs