ITAC Assessment: MA0230
ITAC logo
ITAC Assessment: MA0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DISPOSABLE LABWARE
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 355
Plant Area
n/a
Annual Production 18,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $625,563 8,857,855
kWh
Fuel Oil #2 $32,074 5,755
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,823 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,201

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.1221: Replace obsolete burners with more efficient ones $7,447 $11,800 - $7,447
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,665 $30,800 $6,665
94,373
kWh
-
03 2.6232: Install set-back timers $1,842 $300 $1,842
26,084
kWh
-
04 2.2511: Insulate bare equipment $4,761 $4,725 $4,761
67,409
kWh
-
05 2.3212: Optimize plant power factor $3,643 $9,600 $3,643
51,583
kWh
-
06 2.7224: Reduce space conditioning during non-working hours $1,264 - - $1,264
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $1,201 $430 $1,201
16,999
kWh
-
TOTAL RECOMMENDED $26,823 $57,655 $18,112
256,448
kWh
$8,711
-
MMBtu
TOTAL IMPLEMENTED $1,201 $430 $1,201
16,999
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs