ITAC Assessment: MA0229
ITAC logo
ITAC Assessment: MA0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FILTERS, REGULATORS, ETC
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 194
Plant Area
n/a
Annual Production 550,000
pieces
Production Hrs. Annual 4,375
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,597 2,691,383
kWh
Fuel Oil #4 $39,722 6,552
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,450 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,338

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,565 $30,000 $17,865
211,313
kWh
- $(-3,300.0)
02 2.2414: Use waste heat from hot flue gases to preheat $1,963 - - $1,963
-
MMBtu
-
03 2.3212: Optimize plant power factor $1,759 $4,685 $1,759
20,809
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,388 $4,900 $1,388
15,826
kWh
- -
05 2.4133: Use most efficient type of electric motors $825 $1,900 $825
9,672
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $520 $1,749 $520
6,155
kWh
- -
07 2.2122: Install / repair insulation on condensate lines $430 $170 - $430
-
MMBtu
-
TOTAL RECOMMENDED $21,450 $43,404 $22,357
263,775
kWh
$2,393
-
MMBtu
$(-3,300.0)
TOTAL IMPLEMENTED $2,338 $6,819 $1,908
21,981
kWh
$430
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #4 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs