Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product GLASS FIBER OPTIC WIRE
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area
n/a
Annual Production 164,100
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $328,231 5,152,990
kWh
Fuel Oil #2 $899 140
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $142,818 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,450

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $15,618 $4,950 $15,618
245,311
kWh
- -
02 2.7314: Reduce ventilation air $57,249 $22,320 $57,249
899,179
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,747 $8,188 $5,747
90,270
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $58,450 $102,564 $97,517
1,531,653
kWh
$(-39,067.0)
-
MMBtu
-
05 3.4115: Recover and reuse cooling water $5,754 $14,820 $1,325
20,809
kWh
- $4,429
TOTAL RECOMMENDED $142,818 $152,842 $177,456
2,787,222
kWh
$(-39,067.0)
-
MMBtu
$4,429
TOTAL IMPLEMENTED $58,450 $102,564 $97,517
1,531,653
kWh
$(-39,067.0)
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs