Assessment Year | 1990 |
---|---|
Principal Product | GLASS FIBER OPTIC WIRE |
NAICS |
n/a
|
SIC | 3357: Drawing and Insulating of Nonferrous Wire |
Sales Range | $5 M to 10M |
# of Employees | 55 |
Plant Area |
n/a
|
Annual Production | 164,100
thousand feet
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $328,231 | 5,152,990 |
kWh
|
$0.064 |
Fuel Oil #2 | $899 | 140 |
MMBtu
|
$6.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $142,818 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $58,450 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $15,618 | $4,950 |
$15,618
245,311
kWh
|
- | - | |
02 | 2.7314: Reduce ventilation air | $57,249 | $22,320 |
$57,249
899,179
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,747 | $8,188 |
$5,747
90,270
kWh
|
- | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $58,450 | $102,564 |
$97,517
1,531,653
kWh
|
$(-39,067.0)
-
MMBtu
|
- | |
05 | 3.4115: Recover and reuse cooling water | $5,754 | $14,820 |
$1,325
20,809
kWh
|
- | $4,429 | |
TOTAL RECOMMENDED | $142,818 | $152,842 |
$177,456
2,787,222
kWh
|
$(-39,067.0)
-
MMBtu
|
$4,429 | ||
TOTAL IMPLEMENTED | $58,450 | $102,564 |
$97,517
1,531,653
kWh
|
$(-39,067.0)
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs