ITAC Assessment: MA0195
ITAC logo
ITAC Assessment: MA0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CABLES FOR COMPUTERS
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 6,500,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $353,012 4,646,835
kWh
Fuel Oil #2 $64,829 12,489
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,050 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,148

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $3,539 $1,600 $3,539
46,600
kWh
- -
02 2.2437: Recover waste heat from equipment $10,203 $1,196 - $10,203
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,675 - $4,675
61,547
kWh
- -
04 2.2531: Re-size charging openings or add movable cover or door $245 $95 $245
3,224
kWh
- -
05 2.8114: Change rate schedules or other changes in utility service $12,162 $31,800 $12,162
-
kWh
- -
06 2.6232: Install set-back timers $4,808 $1,521 $4,808
63,306
kWh
- -
07 2.2614: Use cooling tower or economizer to replace chiller cooling $4,956 $9,900 $1,157
15,240
kWh
- $3,799
08 2.2511: Insulate bare equipment $462 $631 - $462
-
MMBtu
-
TOTAL RECOMMENDED $41,050 $46,743 $26,586
189,917
kWh
$10,665
-
MMBtu
$3,799
TOTAL IMPLEMENTED $20,148 $3,348 $9,483
124,853
kWh
$10,665
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings