ITAC Assessment: MA0194
ITAC logo
ITAC Assessment: MA0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ELECTROPLATING STEEL
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 32
Plant Area
n/a
Annual Production 500
thousand feet
Production Hrs. Annual 6,448
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,869 830,891
kWh
Fuel Oil #2 $54,587 10,388
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,755

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $503 $79 $503
6,155
kWh
-
02 2.2443: Re-use or recycle hot or cold process exhaust air $25,980 $38,667 $(-5,289.0)
(-64,771)
kWh
$31,269
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $96 $89 $96
1,172
kWh
-
04 2.2511: Insulate bare equipment $2,541 $7,188 - $2,541
-
MMBtu
05 2.2511: Insulate bare equipment $520 $223 - $520
-
MMBtu
06 2.2444: Use hot process fluids to preheat incoming process fluids $2,174 $3,875 - $2,174
-
MMBtu
07 2.2447: Heat water with exhaust heat $656 $494 - $656
-
MMBtu
TOTAL RECOMMENDED $32,470 $50,615 $(-4,690.0)
(-57,444)
kWh
$37,160
-
MMBtu
TOTAL IMPLEMENTED $27,755 $39,552 $(-4,690.0)
(-57,444)
kWh
$32,445
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs