| Assessment Year | 1990 |
|---|---|
| Principal Product | ELECTROPLATING STEEL |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $1 M to 5M |
| # of Employees | 32 |
| Plant Area |
n/a
|
| Annual Production | 500
thousand feet
|
| Production Hrs. Annual | 6,448
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $67,869 | 830,891 |
kWh
|
$0.082 |
| Fuel Oil #2 | $54,587 | 10,388 |
MMBtu
|
$5.25 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,470 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,755 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $503 | $79 |
$503
6,155
kWh
|
- | |
| 02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $25,980 | $38,667 |
$(-5,289.0)
(-64,771)
kWh
|
$31,269
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $96 | $89 |
$96
1,172
kWh
|
- | |
| 04 | 2.2511: Insulate bare equipment | $2,541 | $7,188 | - |
$2,541
-
MMBtu
|
|
| 05 | 2.2511: Insulate bare equipment | $520 | $223 | - |
$520
-
MMBtu
|
|
| 06 | 2.2444: Use hot process fluids to preheat incoming process fluids | $2,174 | $3,875 | - |
$2,174
-
MMBtu
|
|
| 07 | 2.2447: Heat water with exhaust heat | $656 | $494 | - |
$656
-
MMBtu
|
|
| TOTAL RECOMMENDED | $32,470 | $50,615 |
$(-4,690.0)
(-57,444)
kWh
|
$37,160
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $27,755 | $39,552 |
$(-4,690.0)
(-57,444)
kWh
|
$32,445
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs