Assessment Year | 1990 |
---|---|
Principal Product | ELECTROPLATING STEEL |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 32 |
Plant Area |
n/a
|
Annual Production | 500
thousand feet
|
Production Hrs. Annual | 6,448
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,869 | 830,891 |
kWh
|
$0.082 |
Fuel Oil #2 | $54,587 | 10,388 |
MMBtu
|
$5.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,470 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,755 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $503 | $79 |
$503
6,155
kWh
|
- | |
02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $25,980 | $38,667 |
$(-5,289.0)
(-64,771)
kWh
|
$31,269
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $96 | $89 |
$96
1,172
kWh
|
- | |
04 | 2.2511: Insulate bare equipment | $2,541 | $7,188 | - |
$2,541
-
MMBtu
|
|
05 | 2.2511: Insulate bare equipment | $520 | $223 | - |
$520
-
MMBtu
|
|
06 | 2.2444: Use hot process fluids to preheat incoming process fluids | $2,174 | $3,875 | - |
$2,174
-
MMBtu
|
|
07 | 2.2447: Heat water with exhaust heat | $656 | $494 | - |
$656
-
MMBtu
|
|
TOTAL RECOMMENDED | $32,470 | $50,615 |
$(-4,690.0)
(-57,444)
kWh
|
$37,160
-
MMBtu
|
||
TOTAL IMPLEMENTED | $27,755 | $39,552 |
$(-4,690.0)
(-57,444)
kWh
|
$32,445
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs