Assessment Year | 1990 |
---|---|
Principal Product | CONTRACT HEAT TREATING |
NAICS |
n/a
|
SIC | 3398: Metal Heat Treating |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $545,264 | 7,075,322 |
kWh
|
$0.077 |
Natural Gas | $117,012 | 16,962 |
MMBtu
|
$6.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $130,395 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,208 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $18,643 | $8,173 | - |
$18,643
-
MMBtu
|
|
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $102,544 | $250,000 |
$155,260
2,015,240
kWh
|
$(-52,716.0)
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $8,923 | $336 |
$8,923
115,768
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $285 | $180 |
$285
3,810
kWh
|
- | |
TOTAL RECOMMENDED | $130,395 | $258,689 |
$164,468
2,134,818
kWh
|
$(-34,073.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,208 | $516 |
$9,208
119,578
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs