| Assessment Year | 1990 |
|---|---|
| Principal Product | CONTRACT HEAT TREATING |
| NAICS |
n/a
|
| SIC | 3398: Metal Heat Treating |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $545,264 | 7,075,322 |
kWh
|
$0.077 |
| Natural Gas | $117,012 | 16,962 |
MMBtu
|
$6.90 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $130,395 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,208 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $18,643 | $8,173 | - |
$18,643
-
MMBtu
|
|
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $102,544 | $250,000 |
$155,260
2,015,240
kWh
|
$(-52,716.0)
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $8,923 | $336 |
$8,923
115,768
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $285 | $180 |
$285
3,810
kWh
|
- | |
| TOTAL RECOMMENDED | $130,395 | $258,689 |
$164,468
2,134,818
kWh
|
$(-34,073.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,208 | $516 |
$9,208
119,578
kWh
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs