ITAC Assessment: MA0178
ITAC logo
ITAC Assessment: MA0178
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CONTRACT HEAT TREATING
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 8,736
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $545,264 7,075,322
kWh
Natural Gas $117,012 16,962
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $130,395 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,208

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $18,643 $8,173 - $18,643
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $102,544 $250,000 $155,260
2,015,240
kWh
$(-52,716.0)
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $8,923 $336 $8,923
115,768
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $285 $180 $285
3,810
kWh
-
TOTAL RECOMMENDED $130,395 $258,689 $164,468
2,134,818
kWh
$(-34,073.0)
-
MMBtu
TOTAL IMPLEMENTED $9,208 $516 $9,208
119,578
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs