ITAC Assessment: MA0177
ITAC logo
ITAC Assessment: MA0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product REINFORCED MOLDING COMPONENTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area
n/a
Annual Production 15,000,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $442,105 6,176,143
kWh
Natural Gas $137,597 38,760
MMBtu
Fuel Oil #6 $27,110 9,576
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,216 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,233

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,107 $14,700 $5,350
74,736
kWh
- $(-243.0)
-
MMBtu
02 2.2443: Re-use or recycle hot or cold process exhaust air $10,876 $21,853 - $9,068
-
MMBtu
$1,808
-
MMBtu
03 2.7261: Install timers and/or thermostats $822 $120 $797
11,137
kWh
$25
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $3,411 $8,500 - $2,848
-
MMBtu
$563
-
MMBtu
TOTAL RECOMMENDED $20,216 $45,173 $6,147
85,873
kWh
$11,941
-
MMBtu
$2,128
-
MMBtu
TOTAL IMPLEMENTED $4,233 $8,620 $797
11,137
kWh
$2,873
-
MMBtu
$563
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs