ITAC Assessment: AS0148
ITAC logo
ITAC Assessment: AS0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Plastic and Metal Components
NAICS
n/a
SIC 3451: Screw Machine Products
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 14,500
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 4,212
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,937 136,870
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,059 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,416

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $1,172 $1,376 $1,172
14,947
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $471 - $471
6,155
kWh
03 2.4314: Use synthetic lubricant $542 $279 $542
7,327
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $540 $600 $540
7,034
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,473 $7,071 $2,473
32,532
kWh
06 2.7262: Separate controls of air handlers from ac/ heating systems $385 $750 $385
5,862
kWh
07 2.7241: Install outside air damper / economizer on hvac unit $476 $2,100 $476
7,327
kWh
TOTAL RECOMMENDED $6,059 $12,176 $6,059
81,184
kWh
TOTAL IMPLEMENTED $4,416 $10,800 $4,416
60,082
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs