ITAC Assessment: MA0168
ITAC logo
ITAC Assessment: MA0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PRINTED CIRCUIT BOARDS
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 1,000
thousand feet
Production Hrs. Annual 7,854
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $484,016 7,453,107
kWh
Natural Gas $87,183 15,421
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,505 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,580

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $14,558 $10,000 $14,558
224,209
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,218 - $1,218
18,757
kWh
-
03 2.6232: Install set-back timers $228 $195 $228
3,517
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,362 $570 $2,362
36,342
kWh
-
05 2.2122: Install / repair insulation on condensate lines $475 $305 - $475
-
MMBtu
06 2.4131: Size electric motors for peak operating efficiency $2,664 $2,700 $2,664
41,032
kWh
-
TOTAL RECOMMENDED $21,505 $13,770 $21,030
323,857
kWh
$475
-
MMBtu
TOTAL IMPLEMENTED $3,580 $570 $3,580
55,099
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs