ITAC Assessment: MA0167
ITAC logo
ITAC Assessment: MA0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product MOLDED PLASTIC PRODUCTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $268,442 2,619,871
kWh
Natural Gas $6,187 900
MMBtu
Fuel Oil #2 $6,026 923
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,966 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,507

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,507 $197 $1,507
14,654
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,897 $5,985 $1,897
18,464
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $192 - $192
1,758
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,411 $300 $1,411
13,775
kWh
-
05 2.2437: Recover waste heat from equipment $1,828 $500 - $1,828
-
MMBtu
06 2.2511: Insulate bare equipment $2,131 - $2,131
20,809
kWh
-
TOTAL RECOMMENDED $8,966 $6,982 $7,138
69,460
kWh
$1,828
-
MMBtu
TOTAL IMPLEMENTED $1,507 $197 $1,507
14,654
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs