Assessment Year | 1989 |
---|---|
Principal Product | AUTOMOTIVE BATTERIES |
NAICS |
n/a
|
SIC | 3692: Primary Batteries, Dry and Wet |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 1,500,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Vermont |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,124,597 | 15,167,058 |
kWh
|
$0.074 |
LPG | $258,237 | 58,074 |
MMBtu
|
$4.45 |
Fuel Oil #2 | $22,400 | 22,400 |
MMBtu
|
$1.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,647 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,130 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.8223: Add air shields to trucks to increase fuel mileage | $19,320 | $18,000 | - | - |
$19,320
-
MMBtu
|
|
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,628 | $3,450 |
$4,780
64,478
kWh
|
$(-1,152.0)
-
MMBtu
|
- | |
03 | 2.7261: Install timers and/or thermostats | $1,130 | $180 |
$1,130
15,240
kWh
|
- | - | |
04 | 2.7226: Use computer programs to optimize hvac performance | $842 | $1,700 |
$842
13,189
kWh
|
- | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $21,230 | $7,913 |
$27,967
377,198
kWh
|
$(-6,737.0)
-
MMBtu
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,497 | $908 |
$6,497
87,632
kWh
|
- | - | |
TOTAL RECOMMENDED | $52,647 | $32,151 |
$41,216
557,737
kWh
|
$(-7,889.0)
-
MMBtu
|
$19,320
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,130 | $180 |
$1,130
15,240
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs