ITAC Assessment: MA0166
ITAC logo
ITAC Assessment: MA0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product AUTOMOTIVE BATTERIES
NAICS
n/a
SIC 3692: Primary Batteries, Dry and Wet
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 1,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Vermont

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,124,597 15,167,058
kWh
LPG $258,237 58,074
MMBtu
Fuel Oil #2 $22,400 22,400
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,647 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,130

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #2 Savings
01 2.8223: Add air shields to trucks to increase fuel mileage $19,320 $18,000 - - $19,320
-
MMBtu
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,628 $3,450 $4,780
64,478
kWh
$(-1,152.0)
-
MMBtu
-
03 2.7261: Install timers and/or thermostats $1,130 $180 $1,130
15,240
kWh
- -
04 2.7226: Use computer programs to optimize hvac performance $842 $1,700 $842
13,189
kWh
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $21,230 $7,913 $27,967
377,198
kWh
$(-6,737.0)
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,497 $908 $6,497
87,632
kWh
- -
TOTAL RECOMMENDED $52,647 $32,151 $41,216
557,737
kWh
$(-7,889.0)
-
MMBtu
$19,320
-
MMBtu
TOTAL IMPLEMENTED $1,130 $180 $1,130
15,240
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs