ITAC Assessment: MA0157
ITAC logo
ITAC Assessment: MA0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ANTISEPTIC DISPOSABLE PRODUCTS
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area
n/a
Annual Production 200,000
pieces
Production Hrs. Annual 4,394
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,483 987,104
kWh
Fuel Oil #4 $11,489 2,736
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,193 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,082

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6232: Install set-back timers $363 $175 $363
4,689
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,976 $466 $1,976
25,498
kWh
03 2.3512: De-energize excess transformer capacity $545 $584 $545
7,034
kWh
04 2.2444: Use hot process fluids to preheat incoming process fluids $3,203 $6,025 $3,203
41,325
kWh
05 2.6218: Turn off equipment when not in use $106 - $106
1,465
kWh
TOTAL RECOMMENDED $6,193 $7,250 $6,193
80,011
kWh
TOTAL IMPLEMENTED $2,082 $466 $2,082
26,963
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs