ITAC Assessment: MA0146
ITAC logo
ITAC Assessment: MA0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product SPECIALTY TISSUE PAPER
NAICS
n/a
SIC 2676: Sanitary Paper Products
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area
n/a
Annual Production 19,635
ton
Production Hrs. Annual 8,568
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $837,341 15,266,999
kWh
Natural Gas $514,859 215,736
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,703

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,941 - $1,941
35,463
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,156 $100 $1,156
21,102
kWh
-
03 2.2449: Recover heat from exhausted steam, hot air or hot water $2,380 $4,505 - $2,380
-
MMBtu
04 2.2443: Re-use or recycle hot or cold process exhaust air $15,750 $10,373 - $15,750
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $5,452 $2,816 - $5,452
-
MMBtu
06 2.2511: Insulate bare equipment $3,544 $6,123 - $3,544
-
MMBtu
07 2.3312: Install efficient rectifiers $15,154 $20,306 $15,154
276,377
kWh
-
TOTAL RECOMMENDED $45,377 $44,223 $18,251
332,942
kWh
$27,126
-
MMBtu
TOTAL IMPLEMENTED $23,703 $23,222 $18,251
332,942
kWh
$5,452
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs