ITAC Assessment: MA0498
ITAC logo
ITAC Assessment: MA0498
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Stainless steel and high alloy castings
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 110,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $658,691 9,355,508
kWh
Electricity Fees $600 -
Natural Gas $151,468 36,456
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,949 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,351

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,844 $60,000 $35,844
512,054
kWh
-
02 2.6218: Turn off equipment when not in use $10,867 - $10,867
155,250
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,790 $35,000 $7,790
111,285
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,980 - $3,980
56,848
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,300 $13,000 $4,364
62,352
kWh
$(-1,064.0)
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,132 $25,540 $2,132
30,445
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $808 $2,000 $808
11,541
kWh
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $228 $45 $228
3,264
kWh
-
TOTAL RECOMMENDED $64,949 $135,585 $66,013
943,039
kWh
$(-1,064.0)
-
MMBtu
TOTAL IMPLEMENTED $56,351 $98,585 $57,415
820,213
kWh
$(-1,064.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs