ITAC Assessment: MA0137
ITAC logo
ITAC Assessment: MA0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product ELECTRONIC COILS
NAICS
n/a
SIC 3677: Electronic Coils, Transformers, and Other Inductors
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area
n/a
Annual Production 5,000,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,289 268,171
kWh
Natural Gas $8,200 1,233
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,935 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,229 $3,020 $1,229
12,603
kWh
02 2.3191: Use demand controller or load shedder $588 $200 $588
-
kWh
03 2.4221: Install compressor air intakes in coolest locations $118 $56 $118
1,172
kWh
TOTAL RECOMMENDED $1,935 $3,276 $1,935
13,775
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs