ITAC Assessment: MA0136
ITAC logo
ITAC Assessment: MA0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PICTURE FRAMES
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 25,000,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,534 620,750
kWh
Natural Gas $13,537 1,872
MMBtu
Fuel Oil #6 $15,373 3,560
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,439

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.6232: Install set-back timers $422 $892 $422
4,982
kWh
- -
02 2.7221: Lower temperature during the winter season and vice-versa $1,244 $480 - $1,244
-
MMBtu
-
03 2.4131: Size electric motors for peak operating efficiency $1,017 $1,400 $1,017
12,016
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $372 $200 $372
4,396
kWh
- -
05 2.7291: Reschedule and rearrange multiple-source heating systems $2,595 $3,602 - $6,724
-
MMBtu
$(-4,129.0)
-
MMBtu
TOTAL RECOMMENDED $5,650 $6,574 $1,811
21,394
kWh
$7,968
-
MMBtu
$(-4,129.0)
-
MMBtu
TOTAL IMPLEMENTED $1,439 $2,292 $1,439
16,998
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs