Assessment Year | 1989 |
---|---|
Principal Product | PICTURE FRAMES |
NAICS |
n/a
|
SIC | 2499: Wood Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 25,000,000
pieces
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $52,534 | 620,750 |
kWh
|
$0.085 |
Natural Gas | $13,537 | 1,872 |
MMBtu
|
$7.23 |
Fuel Oil #6 | $15,373 | 3,560 |
MMBtu
|
$4.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,650 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,439 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|---|
01 | 2.6232: Install set-back timers | $422 | $892 |
$422
4,982
kWh
|
- | - | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $1,244 | $480 | - |
$1,244
-
MMBtu
|
- | |
03 | 2.4131: Size electric motors for peak operating efficiency | $1,017 | $1,400 |
$1,017
12,016
kWh
|
- | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $372 | $200 |
$372
4,396
kWh
|
- | - | |
05 | 2.7291: Reschedule and rearrange multiple-source heating systems | $2,595 | $3,602 | - |
$6,724
-
MMBtu
|
$(-4,129.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $5,650 | $6,574 |
$1,811
21,394
kWh
|
$7,968
-
MMBtu
|
$(-4,129.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,439 | $2,292 |
$1,439
16,998
kWh
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs