Assessment Year | 1988 |
---|---|
Principal Product | PROPELLER DE-ICERS |
NAICS |
n/a
|
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 85 |
Plant Area |
n/a
|
Annual Production | 30,000
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $53,274 | 611,958 |
kWh
|
$0.087 |
Fuel Oil #4 | $26,947 | 6,754 |
MMBtu
|
$3.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,923 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,844 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #4 Savings |
---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $4,165 | $660 | - |
$4,165
-
MMBtu
|
|
02 | 2.1213: Direct warmest air to combustion intake | $268 | $103 | - |
$268
-
MMBtu
|
|
03 | 2.4239: Eliminate or reduce compressed air usage | $2,536 | $850 |
$2,536
29,015
kWh
|
- | |
04 | 2.7122: Disconnect ballasts | $148 | $276 |
$148
1,758
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $572 | $288 |
$572
6,448
kWh
|
- | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $91 | $20 |
$91
1,172
kWh
|
- | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $588 | - |
$588
6,741
kWh
|
- | |
08 | 2.7226: Use computer programs to optimize hvac performance | $13,555 | $22,500 |
$13,555
155,627
kWh
|
- | |
TOTAL RECOMMENDED | $21,923 | $24,697 |
$17,490
200,761
kWh
|
$4,433
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,844 | $680 |
$679
7,913
kWh
|
$4,165
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #4 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs