ITAC Assessment: MA0126
ITAC logo
ITAC Assessment: MA0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PROPELLER DE-ICERS
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area
n/a
Annual Production 30,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,274 611,958
kWh
Fuel Oil #4 $26,947 6,754
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,923 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,844

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.7261: Install timers and/or thermostats $4,165 $660 - $4,165
-
MMBtu
02 2.1213: Direct warmest air to combustion intake $268 $103 - $268
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $2,536 $850 $2,536
29,015
kWh
-
04 2.7122: Disconnect ballasts $148 $276 $148
1,758
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $572 $288 $572
6,448
kWh
-
06 2.7111: Reduce illumination to minimum necessary levels $91 $20 $91
1,172
kWh
-
07 2.6212: Turn off equipment during breaks, reduce operating time $588 - $588
6,741
kWh
-
08 2.7226: Use computer programs to optimize hvac performance $13,555 $22,500 $13,555
155,627
kWh
-
TOTAL RECOMMENDED $21,923 $24,697 $17,490
200,761
kWh
$4,433
-
MMBtu
TOTAL IMPLEMENTED $4,844 $680 $679
7,913
kWh
$4,165
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs