ITAC Assessment: MA0118
ITAC logo
ITAC Assessment: MA0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product INDUSTRIAL TISSUES
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $5
M
to 10
M
# of Employees 33
Plant Area
n/a
Annual Production 3,000
ton
Production Hrs. Annual 5,760
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $305,168 4,514,947
kWh
Fuel Oil #6 $227,385 64,567
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $472,821 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,907

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $4,171 $1,275 - $4,171
-
MMBtu
-
02 2.2113: Repair or replace steam traps $8,138 $1,464 - $9,508
-
MMBtu
$(-1,370.0)
03 2.2136: Install / repair insulation on steam lines $2,626 $930 - $2,626
-
MMBtu
-
04 2.7492: Use proper thickness of insulation on building envelope $743 $990 - $743
-
MMBtu
-
05 2.4322: Use or replace with energy efficient substitutes $63,601 $46,000 $63,601
815,358
kWh
- -
06 2.2414: Use waste heat from hot flue gases to preheat $2,658 $377 - $2,658
-
MMBtu
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $2,200 $340 - $2,200
-
MMBtu
-
08 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $371,179 $670,000 $292,032
3,744,138
kWh
$79,147
-
MMBtu
-
09 2.2515: Use optimum thickness insulation $2,742 $2,160 - $2,742
-
MMBtu
-
10 2.2443: Re-use or recycle hot or cold process exhaust air $14,763 $20,100 - $14,763
-
MMBtu
-
TOTAL RECOMMENDED $472,821 $743,636 $355,633
4,559,496
kWh
$118,558
-
MMBtu
$(-1,370.0)
TOTAL IMPLEMENTED $16,907 $5,921 - $18,277
-
MMBtu
$(-1,370.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs