Assessment Year | 1988 |
---|---|
Principal Product | INDUSTRIAL TISSUES |
NAICS |
n/a
|
SIC | 2621: Paper Mills |
Sales Range | $5 M to 10M |
# of Employees | 33 |
Plant Area |
n/a
|
Annual Production | 3,000
ton
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $305,168 | 4,514,947 |
kWh
|
$0.068 |
Fuel Oil #6 | $227,385 | 64,567 |
MMBtu
|
$3.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $472,821 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,907 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $4,171 | $1,275 | - |
$4,171
-
MMBtu
|
- | |
02 | 2.2113: Repair or replace steam traps | $8,138 | $1,464 | - |
$9,508
-
MMBtu
|
$(-1,370.0) | |
03 | 2.2136: Install / repair insulation on steam lines | $2,626 | $930 | - |
$2,626
-
MMBtu
|
- | |
04 | 2.7492: Use proper thickness of insulation on building envelope | $743 | $990 | - |
$743
-
MMBtu
|
- | |
05 | 2.4322: Use or replace with energy efficient substitutes | $63,601 | $46,000 |
$63,601
815,358
kWh
|
- | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $2,658 | $377 | - |
$2,658
-
MMBtu
|
- | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,200 | $340 | - |
$2,200
-
MMBtu
|
- | |
08 | 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust | $371,179 | $670,000 |
$292,032
3,744,138
kWh
|
$79,147
-
MMBtu
|
- | |
09 | 2.2515: Use optimum thickness insulation | $2,742 | $2,160 | - |
$2,742
-
MMBtu
|
- | |
10 | 2.2443: Re-use or recycle hot or cold process exhaust air | $14,763 | $20,100 | - |
$14,763
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $472,821 | $743,636 |
$355,633
4,559,496
kWh
|
$118,558
-
MMBtu
|
$(-1,370.0) | ||
TOTAL IMPLEMENTED | $16,907 | $5,921 | - |
$18,277
-
MMBtu
|
$(-1,370.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs