Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PRINTED MATERIAL
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 212
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $290,672 2,907,093
kWh
Natural Gas $41,219 7,240
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,765 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $6,994 $1,796 $876
8,792
kWh
$6,118
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,567 $738 $5,567
55,686
kWh
-
03 2.7494: Install storm windows and doors $2,549 $3,800 - $2,549
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $4,655 $200 - $4,655
-
MMBtu
TOTAL RECOMMENDED $19,765 $6,534 $6,443
64,478
kWh
$13,322
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs