ITAC Assessment: AS0293
ITAC logo
ITAC Assessment: AS0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Aluminum Extruded Products for Aircraft Applications
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 124
Plant Area 35,000
ft2
Annual Production 21,000,000
lb
Production Hrs. Annual 5,400
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $388,530 12,951,000
kWh
Electricity Demand $294,942 45,374
kW-mo/yr
Electricity Fees $50,494 -
Natural Gas $221,652 66,407
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,066 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,069

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Primary Product Savings By-product Production Savings
01 2.7124: Make a practice of turning off lights when not needed $5,069 $2,460 $5,069
158,400
kWh
- - - -
02 2.4314: Use synthetic lubricant $4,652 $694 $1,313
40,747
kWh
$473
-
kW-mo/yr
$2,866
-
gal
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $618 $618 $453
14,174
kWh
$165
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $3,710 $3,532 $2,727
85,204
kWh
$983
-
kW-mo/yr
- - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $2,330 $60 - - - - $2,330
06 3.6192: Use a less expensive method of waste removal $2,727 $60 - - - - $2,727
07 4.431: Train operators for maximum operating efficiency $71,280 $5,645 - - - $71,280 -
08 4.621: Use fixtures to reduce machine changeout times $1,680 $390 - - - $1,680 -
TOTAL RECOMMENDED $92,066 $13,459 $9,562
298,525
kWh
$1,621
-
kW-mo/yr
$2,866
-
gal
$72,960 $5,057
TOTAL IMPLEMENTED $5,069 $2,460 $5,069
158,400
kWh
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs