ITAC Assessment: CO0367
ITAC logo
ITAC Assessment: CO0367
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product fabric tops for sport utility vehicles
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 214,357
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 2,184
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,387 2,569,754
kWh
Electricity Demand $84,183 8,285
kW-mo/yr
Natural Gas $35,664 9,184
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,778 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,418

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,771 $13,736 $3,473
103,458
kWh
$4,298
-
kW-mo/yr
- - -
02 3.5313: Increase amount of waste recovered for resale $6,360 $2,000 - - $6,360
-
lb
- -
03 3.5315: Lease / purchase baler; sell cardboard to recycler $1,440 $8,000 - - - $(-360.0) $1,800
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,170 $240 $440
13,189
kWh
$730
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $37 $52 $18
586
kWh
$19
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $16,778 $24,028 $3,931
117,233
kWh
$5,047
-
kW-mo/yr
$6,360
-
lb
$(-360.0) $1,800
TOTAL IMPLEMENTED $10,418 $22,028 $3,931
117,233
kWh
$5,047
-
kW-mo/yr
- $(-360.0) $1,800
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs