ITAC Assessment: MA0113
ITAC logo
ITAC Assessment: MA0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product ELECTRIC POWER SUPPLIES
NAICS
n/a
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area
n/a
Annual Production 6,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,618 1,958,089
kWh
Fuel Oil #2 $12,600 3,402
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,232 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,237

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7314: Reduce ventilation air $1,763 $8 $91
1,172
kWh
$1,672
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $474 - - $666
-
MMBtu
$(-192.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,486 $1,102 $3,486
44,549
kWh
- -
04 2.2491: Use cooling air which cools hot work pieces for space heating $3,344 $8,408 $(-160.0)
(-2,052)
kWh
$3,504
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $90 $75 $90
1,172
kWh
- -
06 2.7226: Use computer programs to optimize hvac performance $2,075 $2,000 $2,075
26,377
kWh
- -
TOTAL RECOMMENDED $11,232 $11,593 $5,582
71,218
kWh
$5,842
-
MMBtu
$(-192.0)
TOTAL IMPLEMENTED $2,237 $8 $91
1,172
kWh
$2,338
-
MMBtu
$(-192.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs