ITAC Assessment: MA0112
ITAC logo
ITAC Assessment: MA0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product THERMOPLASTIC SHEETING
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $5
M
to 10
M
# of Employees 44
Plant Area
n/a
Annual Production 10,000,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $287,399 3,392,732
kWh
Natural Gas $24,082 4,035
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,847 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $534

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $14,021 $8,866 $(-695.0)
(-8,206)
kWh
$14,716
-
MMBtu
02 2.6232: Install set-back timers $534 - $349
4,103
kWh
$185
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,210 $243 $2,210
26,084
kWh
-
04 2.5194: Redesign process $5,082 - $5,082
60,082
kWh
-
TOTAL RECOMMENDED $21,847 $9,109 $6,946
82,063
kWh
$14,901
-
MMBtu
TOTAL IMPLEMENTED $534 - $349
4,103
kWh
$185
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs