ITAC Assessment: MA0110
ITAC logo
ITAC Assessment: MA0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PEANUT BUTTER & CANNED PEAS
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area
n/a
Annual Production 9,000
ton
Production Hrs. Annual 3,380
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,635 2,092,614
kWh
Natural Gas $103,908 17,473
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,679 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $2,796 $7,688 - $2,796
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,644 - $4,424
61,547
kWh
- $(-780.0)
03 2.4231: Reduce the pressure of compressed air to the minimum required $725 - $725
10,258
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $160 $150 $160
2,345
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,548 $130 $1,548
21,395
kWh
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,075 $50 $1,075
-
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,731 - $1,731
24,033
kWh
- -
TOTAL RECOMMENDED $11,679 $8,018 $9,663
119,578
kWh
$2,796
-
MMBtu
$(-780.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs