ITAC Assessment: SD0395
ITAC logo
ITAC Assessment: SD0395
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product SPAS Vacuum Thermoformed Acrylic
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 134,936
ft2
Annual Production 12,000
pieces
Production Hrs. Annual 2,040
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,685 2,116,205
kWh
Electricity Demand $115,454 7,950
kW-mo/yr
Electricity Fees $13,764 -
Natural Gas $37,420 3,989
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,247 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,849

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,816 $8,425 $10,816
65,332
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,658 $13,350 $5,658
44,268
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,155 $240 $2,497
31,160
kWh
$2,658
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $4,081 $1,213 - - $4,081
-
MMBtu
05 2.7135: Install occupancy sensors $3,878 $3,400 $1,563
19,480
kWh
$2,315
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $659 $1,146 $659
8,223
kWh
- -
TOTAL RECOMMENDED $30,247 $27,774 $21,193
168,463
kWh
$4,973
-
kW-mo/yr
$4,081
-
MMBtu
TOTAL IMPLEMENTED $19,849 $12,065 $14,876
115,972
kWh
$4,973
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs