ITAC Assessment: MA0107
ITAC logo
ITAC Assessment: MA0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product AIR COMPRESSORS & PARTS
NAICS
n/a
SIC 3563: Air and Gas Compressors
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 3,500
pieces
Production Hrs. Annual 2,550
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,921 1,553,927
kWh
Natural Gas $11,518 1,758
MMBtu
Fuel Oil #4 $16,604 4,464
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,068 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,635

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,770 $664 $2,770
39,566
kWh
- -
02 2.6214: Shut off pilots in standby equipment $132 - - $132
-
MMBtu
-
03 2.7226: Use computer programs to optimize hvac performance $7,636 $17,200 $7,636
109,027
kWh
- -
04 2.7261: Install timers and/or thermostats $5,097 $1,800 - $5,097
-
MMBtu
-
05 2.2532: Use only amount of air necessary to prevent explosion hazard $266 $100 - - $266
-
MMBtu
06 2.2511: Insulate bare equipment $167 $98 $167
2,345
kWh
- -
TOTAL RECOMMENDED $16,068 $19,862 $10,573
150,938
kWh
$5,229
-
MMBtu
$266
-
MMBtu
TOTAL IMPLEMENTED $15,635 $19,664 $10,406
148,593
kWh
$5,229
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs