ITAC Assessment: MA0100
ITAC logo
ITAC Assessment: MA0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CIRCUIT BOARDS
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 470
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $693,093 8,682,884
kWh
Natural Gas $137,855 19,002
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,325 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,754

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,258 $2,050 $11,258
12,309
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,571 $19,480 $10,722
134,232
kWh
$(-4,151.0)
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $2,496 $200 $2,496
31,360
kWh
-
TOTAL RECOMMENDED $20,325 $21,730 $24,476
177,901
kWh
$(-4,151.0)
-
MMBtu
TOTAL IMPLEMENTED $13,754 $2,250 $13,754
43,669
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs