ITAC Assessment: GT0592
ITAC logo
ITAC Assessment: GT0592
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product sweatshirts
NAICS
n/a
SIC 2322: Men's and Boys' Underwear and Nightwear
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 80,000
ft2
Annual Production 15,600,000
pieces
Production Hrs. Annual 8,200
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,940 2,044,256
kWh
Electricity Demand $20,176 5,765
kW-mo/yr
Electricity Fees $4,760 -
Natural Gas $20,639 3,667
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,730

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $12,080 $2,600 $8,596
177,608
kWh
- $344 $3,140
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,650 $34,000 $5,745
118,699
kWh
$2,562
-
kW-mo/yr
$343 -
03 2.4235: Remove or close off unneeded compressed air lines $10,750 $400 $9,404
194,314
kWh
$924
-
kW-mo/yr
$422 -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $720 $3,730 $468
9,672
kWh
$210
-
kW-mo/yr
$42 -
05 2.3212: Optimize plant power factor $6,620 $11,100 - $6,370
-
kW-mo/yr
$250 -
TOTAL RECOMMENDED $38,820 $51,830 $24,213
500,293
kWh
$10,066
-
kW-mo/yr
$1,401 $3,140
-
MMBtu
TOTAL IMPLEMENTED $20,730 $36,600 $14,341
296,307
kWh
$2,562
-
kW-mo/yr
$687 $3,140
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs