ITAC Assessment: MA0091
ITAC logo
ITAC Assessment: MA0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product HI-TEMP WIRE & CABLES
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,674 2,152,989
kWh
Fuel Oil #2 $11,415 2,384
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,952

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.2437: Recover waste heat from equipment $712 $100 - $712
-
MMBtu
02 2.2511: Insulate bare equipment $4,334 $1,215 $4,334
55,979
kWh
-
03 2.7141: Lower light fixtures in high ceiling areas $8,321 $3,062 $8,321
107,562
kWh
-
04 2.7261: Install timers and/or thermostats $1,619 $400 - $1,619
-
MMBtu
05 2.3191: Use demand controller or load shedder $3,000 $3,400 $3,000
-
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,333 - $2,333
30,188
kWh
-
TOTAL RECOMMENDED $20,319 $8,177 $17,988
193,729
kWh
$2,331
-
MMBtu
TOTAL IMPLEMENTED $3,952 $400 $2,333
30,188
kWh
$1,619
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings