ITAC Assessment: MA0087
ITAC logo
ITAC Assessment: MA0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product IRON BOILERS & SECTIONS
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 375
Plant Area
n/a
Annual Production 37,500,000
lb
Production Hrs. Annual 4,500
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $460,627 5,490,915
kWh
Natural Gas $355,627 71,862
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $130,381 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,536

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $92,624 $210,000 - $42,768
-
MMBtu
$49,856
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,475 $247 $1,475
17,585
kWh
- -
03 2.6232: Install set-back timers $927 $100 $927
11,137
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,245 $4,500 $1,699
20,223
kWh
- $546
05 2.7494: Install storm windows and doors $1,272 $3,530 - $1,272
-
MMBtu
-
06 2.7492: Use proper thickness of insulation on building envelope $1,589 $2,249 - $1,589
-
MMBtu
-
07 2.3212: Optimize plant power factor $864 $3,200 $864
10,258
kWh
- -
08 2.7229: Air condition only space necessary $20,849 $1,360 - $20,849
-
MMBtu
-
09 2.1233: Analyze flue gas for proper air/fuel ratio $8,536 $1,350 - $9,400
-
MMBtu
$(-864.0)
TOTAL RECOMMENDED $130,381 $226,536 $4,965
59,203
kWh
$75,878
-
MMBtu
$49,538
TOTAL IMPLEMENTED $8,536 $1,350 - $9,400
-
MMBtu
$(-864.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs