| Assessment Year | 1987 |
|---|---|
| Principal Product | IRON BOILERS & SECTIONS |
| NAICS |
n/a
|
| SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
| Sales Range | $10 M to 50M |
| # of Employees | 375 |
| Plant Area |
n/a
|
| Annual Production | 37,500,000
lb
|
| Production Hrs. Annual | 4,500
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $460,627 | 5,490,915 |
kWh
|
$0.084 |
| Natural Gas | $355,627 | 71,862 |
MMBtu
|
$4.95 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $130,381 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,536 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $92,624 | $210,000 | - |
$42,768
-
MMBtu
|
$49,856 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,475 | $247 |
$1,475
17,585
kWh
|
- | - | |
| 03 | 2.6232: Install set-back timers | $927 | $100 |
$927
11,137
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,245 | $4,500 |
$1,699
20,223
kWh
|
- | $546 | |
| 05 | 2.7494: Install storm windows and doors | $1,272 | $3,530 | - |
$1,272
-
MMBtu
|
- | |
| 06 | 2.7492: Use proper thickness of insulation on building envelope | $1,589 | $2,249 | - |
$1,589
-
MMBtu
|
- | |
| 07 | 2.3212: Optimize plant power factor | $864 | $3,200 |
$864
10,258
kWh
|
- | - | |
| 08 | 2.7229: Air condition only space necessary | $20,849 | $1,360 | - |
$20,849
-
MMBtu
|
- | |
| 09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,536 | $1,350 | - |
$9,400
-
MMBtu
|
$(-864.0) | |
| TOTAL RECOMMENDED | $130,381 | $226,536 |
$4,965
59,203
kWh
|
$75,878
-
MMBtu
|
$49,538 | ||
| TOTAL IMPLEMENTED | $8,536 | $1,350 | - |
$9,400
-
MMBtu
|
$(-864.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs