ITAC Assessment: MA0085
ITAC logo
ITAC Assessment: MA0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product COLD ROLLED STEEL STRIP
NAICS
n/a
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 216,000
ton
Production Hrs. Annual 6,120
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $659,544 7,137,749
kWh
Natural Gas $256,628 50,032
MMBtu
Fuel Oil #4 $53,557 11,232
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,399 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,030 $8,280 $10,030
90,856
kWh
- -
02 2.2113: Repair or replace steam traps $13,412 - - $14,672
-
MMBtu
$(-1,260.0)
03 2.2111: Install steam trap $1,210 $75 - $1,210
-
MMBtu
-
04 2.7494: Install storm windows and doors $10,280 $11,000 - $10,280
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $11,978 $1,320 - $11,978
-
MMBtu
-
06 2.3312: Install efficient rectifiers $6,936 $11,800 $6,936
58,030
kWh
- -
07 2.4322: Use or replace with energy efficient substitutes $13,433 $17,320 $13,433
145,955
kWh
- -
08 2.3191: Use demand controller or load shedder $33,120 $3,800 $33,120
-
kWh
- -
TOTAL RECOMMENDED $100,399 $53,595 $63,519
294,841
kWh
$38,140
-
MMBtu
$(-1,260.0)
TOTAL IMPLEMENTED $78,820 $24,400 $43,150
90,856
kWh
$36,930
-
MMBtu
$(-1,260.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs