Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product COLORED PRINTED MATERIAL
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 285
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 7,104
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $486,682 5,735,053
kWh
Natural Gas $161,796 27,526
MMBtu
Fuel Oil #2 $43,162 7,559
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,648 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,031

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Fuel Oil #4 Savings
01 2.4221: Install compressor air intakes in coolest locations $1,617 $340 $1,617
19,050
kWh
- - -
02 2.1331: Burn a less expensive grade of fuel $2,485 - - - $26,283
-
MMBtu
$(-23,798.0)
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,118 $1,875 $2,935
34,584
kWh
$(-817.0)
-
MMBtu
- -
04 2.4239: Eliminate or reduce compressed air usage $14,872 $300 $14,872
175,264
kWh
- - -
05 2.2443: Re-use or recycle hot or cold process exhaust air $11,848 $890 - - $11,848
-
MMBtu
-
06 2.2443: Re-use or recycle hot or cold process exhaust air $4,708 $7,608 $(-323.0)
(-3,810)
kWh
- $5,031
-
MMBtu
-
TOTAL RECOMMENDED $37,648 $11,013 $19,101
225,088
kWh
$(-817.0)
-
MMBtu
$43,162
-
MMBtu
$(-23,798.0)
-
MMBtu
TOTAL IMPLEMENTED $36,031 $10,673 $17,484
206,038
kWh
$(-817.0)
-
MMBtu
$43,162
-
MMBtu
$(-23,798.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Fuel Oil #4 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs