ITAC Assessment: MA0078
ITAC logo
ITAC Assessment: MA0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product TRACK PINS FOR TANKS
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 558,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,558 2,151,817
kWh
Natural Gas $14,699 2,395
MMBtu
LPG $11,500 824
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,617

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,650 $2,760 $4,650
53,341
kWh
02 2.5123: Reduce fluid flow rates $17,169 $20,900 $17,169
196,952
kWh
03 2.4133: Use most efficient type of electric motors $2,530 $3,500 $2,530
29,015
kWh
04 2.4221: Install compressor air intakes in coolest locations $287 $100 $287
3,224
kWh
05 2.7111: Reduce illumination to minimum necessary levels $827 $240 $827
9,379
kWh
06 2.2614: Use cooling tower or economizer to replace chiller cooling $14,610 $22,000 $14,610
167,937
kWh
TOTAL RECOMMENDED $40,073 $49,500 $40,073
459,848
kWh
TOTAL IMPLEMENTED $22,617 $28,500 $22,617
259,672
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs