ITAC Assessment: AM0058
ITAC logo
ITAC Assessment: AM0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PAPER FIBER INSULATION
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area
n/a
Annual Production 300,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,711 453,986
kWh
Other Energy $4,500 563
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,885 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,730

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Energy Savings Administrative Changes Savings
01 2.8227: Adjust / maintain fork lift trucks for most efficient operation $1,450 - - $450
-
MMBtu
$1,000
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $280 $300 $280
3,810
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $155 - $155
3,224
kWh
- -
TOTAL RECOMMENDED $1,885 $300 $435
7,034
kWh
$450
-
MMBtu
$1,000
TOTAL IMPLEMENTED $1,730 $300 $280
3,810
kWh
$450
-
MMBtu
$1,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs