ITAC Assessment: MA0063
ITAC logo
ITAC Assessment: MA0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product LITHOGRAPH PRINT PLATES
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $303,738 3,927,902
kWh
Natural Gas $85,843 17,892
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,752 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,799

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $325 $60 $325
4,103
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $282 $100 $282
3,517
kWh
- -
03 2.4133: Use most efficient type of electric motors $428 $586 $428
5,569
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,963 $450 - $2,251
-
MMBtu
$(-288.0)
05 2.2113: Repair or replace steam traps $5,083 $200 - $5,683
-
MMBtu
$(-600.0)
06 2.3322: Use existing dam to generate electricity $36,671 $180,000 $36,671
361,958
kWh
- -
TOTAL RECOMMENDED $44,752 $181,396 $37,706
375,147
kWh
$7,934
-
MMBtu
$(-888.0)
TOTAL IMPLEMENTED $7,799 $1,296 $753
9,672
kWh
$7,934
-
MMBtu
$(-888.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs