Assessment Year | 1986 |
---|---|
Principal Product | LITHOGRAPH PRINT PLATES |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
n/a
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 5,760
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $303,738 | 3,927,902 |
kWh
|
$0.077 |
Natural Gas | $85,843 | 17,892 |
MMBtu
|
$4.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,752 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,799 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $325 | $60 |
$325
4,103
kWh
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $282 | $100 |
$282
3,517
kWh
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $428 | $586 |
$428
5,569
kWh
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,963 | $450 | - |
$2,251
-
MMBtu
|
$(-288.0) | |
05 | 2.2113: Repair or replace steam traps | $5,083 | $200 | - |
$5,683
-
MMBtu
|
$(-600.0) | |
06 | 2.3322: Use existing dam to generate electricity | $36,671 | $180,000 |
$36,671
361,958
kWh
|
- | - | |
TOTAL RECOMMENDED | $44,752 | $181,396 |
$37,706
375,147
kWh
|
$7,934
-
MMBtu
|
$(-888.0) | ||
TOTAL IMPLEMENTED | $7,799 | $1,296 |
$753
9,672
kWh
|
$7,934
-
MMBtu
|
$(-888.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs