Assessment Year | 1986 |
---|---|
Principal Product | PLASTIC SHEET GOODS |
NAICS |
n/a
|
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $5 M to 10M |
# of Employees | 55 |
Plant Area |
n/a
|
Annual Production | 1,250,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $261,810 | 3,337,632 |
kWh
|
$0.078 |
Natural Gas | $55,039 | 7,879 |
MMBtu
|
$6.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $90,954 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $8,920 | $8,800 | - |
$8,920
-
MMBtu
|
|
02 | 2.7221: Lower temperature during the winter season and vice-versa | $1,056 | $850 | - |
$1,056
-
MMBtu
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $497 | $250 |
$497
6,448
kWh
|
- | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,047 | $190 |
$2,047
26,084
kWh
|
- | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $2,381 | $30 |
$2,381
30,481
kWh
|
- | |
06 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $25,584 | $22,400 |
$13,195
168,230
kWh
|
$12,389
-
MMBtu
|
|
07 | 2.2444: Use hot process fluids to preheat incoming process fluids | $10,447 | $7,700 | - |
$10,447
-
MMBtu
|
|
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $40,022 | $35,300 |
$64,739
825,615
kWh
|
$(-24,717.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $90,954 | $75,520 |
$82,859
1,056,858
kWh
|
$8,095
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs