| Assessment Year | 1986 |
|---|---|
| Principal Product | PLASTIC SHEET GOODS |
| NAICS |
n/a
|
| SIC | 3081: Unsupported Plastics Film and Sheet |
| Sales Range | $5 M to 10M |
| # of Employees | 55 |
| Plant Area |
n/a
|
| Annual Production | 1,250,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $261,810 | 3,337,632 |
kWh
|
$0.078 |
| Natural Gas | $55,039 | 7,879 |
MMBtu
|
$6.99 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $90,954 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $8,920 | $8,800 | - |
$8,920
-
MMBtu
|
|
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $1,056 | $850 | - |
$1,056
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $497 | $250 |
$497
6,448
kWh
|
- | |
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,047 | $190 |
$2,047
26,084
kWh
|
- | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $2,381 | $30 |
$2,381
30,481
kWh
|
- | |
| 06 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $25,584 | $22,400 |
$13,195
168,230
kWh
|
$12,389
-
MMBtu
|
|
| 07 | 2.2444: Use hot process fluids to preheat incoming process fluids | $10,447 | $7,700 | - |
$10,447
-
MMBtu
|
|
| 08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $40,022 | $35,300 |
$64,739
825,615
kWh
|
$(-24,717.0)
-
MMBtu
|
|
| TOTAL RECOMMENDED | $90,954 | $75,520 |
$82,859
1,056,858
kWh
|
$8,095
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs