| Assessment Year | 1985 |
|---|---|
| Principal Product | ELECTRICAL RESISTANCE WIRE |
| NAICS |
n/a
|
| SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
| Sales Range | $10 M to 50M |
| # of Employees | 110 |
| Plant Area |
n/a
|
| Annual Production | 2,600,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Connecticut |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $371,669 | 5,286,049 |
kWh
|
$0.070 |
| Natural Gas | $8,858 | 968 |
MMBtu
|
$9.15 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $51,521 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $721 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $721 | $500 |
$721
10,258
kWh
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,081 | $87 |
$2,081
29,601
kWh
|
|
| 03 | 2.4322: Use or replace with energy efficient substitutes | $15,656 | $40,000 |
$15,656
222,743
kWh
|
|
| 04 | 2.6218: Turn off equipment when not in use | $33,063 | $3,200 |
$33,063
470,399
kWh
|
|
| TOTAL RECOMMENDED | $51,521 | $43,787 |
$51,521
733,001
kWh
|
||
| TOTAL IMPLEMENTED | $721 | $500 |
$721
10,258
kWh
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs