Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product ELECTRICAL RESISTANCE WIRE
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 2,600,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $371,669 5,286,049
kWh
Natural Gas $8,858 968
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,521 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $721

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $721 $500 $721
10,258
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,081 $87 $2,081
29,601
kWh
03 2.4322: Use or replace with energy efficient substitutes $15,656 $40,000 $15,656
222,743
kWh
04 2.6218: Turn off equipment when not in use $33,063 $3,200 $33,063
470,399
kWh
TOTAL RECOMMENDED $51,521 $43,787 $51,521
733,001
kWh
TOTAL IMPLEMENTED $721 $500 $721
10,258
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs