ITAC Assessment: MA0044
ITAC logo
ITAC Assessment: MA0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CLAM PRODUCTS,SEAFOOD
NAICS
n/a
SIC 2091: Canned and Cured Fish and Seafoods
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 23,630
bushels
Production Hrs. Annual 2,470
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,722 1,138,042
kWh
LPG $42,760 4,946
MMBtu
Fuel Oil #2 $28,187 4,340
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,471 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,471

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #2 Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $760 $1,390 - - $760
-
MMBtu
02 2.7261: Install timers and/or thermostats $1,253 $600 - $310
-
MMBtu
$943
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $207 $200 - $207
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $3,311 $1,470 - $3,311
-
MMBtu
-
05 2.2447: Heat water with exhaust heat $1,940 $1,466 $813
11,137
kWh
$1,127
-
MMBtu
-
TOTAL RECOMMENDED $7,471 $5,126 $813
11,137
kWh
$4,955
-
MMBtu
$1,703
-
MMBtu
TOTAL IMPLEMENTED $7,471 $5,126 $813
11,137
kWh
$4,955
-
MMBtu
$1,703
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs